I Found A Planet

Chapter 45: Power problem, solve!

Since October 20th.

In the next half month.

On the other side of the camp.

Chen Jin is in a very busy state.

Use a universal capsule factory to print wind turbine components and make generators!

Of course, Chen Jin is not alone in his busy schedule. He has hundreds of powerful robots, helping him on the side and acting as a free coolie.

So there are not many places for him to make efforts.

Even so, he is tired enough to ask him to solve a lot of troubles and conduct command and dispatch.

The first is the energy supply problem of the capsule factory.

The capsule factory is also a factory, and it also has the characteristics of “large power consumption”.

Its normal standby power consumption is 20KW, the conventional power is 80KW, and the maximum power is 300kw!

Chen Jin broke the power supply of the supercomputer (data has been exported in advance), and connected all 30KW home circuits in his room to the capsule factory.

It is also just to let the capsule factory start up smoothly and be ready for work.

To make it work properly, there is at least a power gap of 60KW.

How to fill this gap?

High-energy battery.

A large 10 kg high-energy battery provides up to 3 kW of output power.

Connecting twenty large high-energy batteries in parallel is enough to provide the power needed to operate the capsule factory.

However, under the high-power working condition of 3KW, the large high-energy battery can only work for 12 hours, and it will emit a lot of heat, and the battery safety is affected.

Only the ‘Exploration One’ with 100 large high-energy batteries in the battery compartment can be opened to provide sufficient power as a power-supplied vehicle.

Even so, the power consumption of the capsule factory is beyond imagination. Even if all the batteries are full of electricity, the 'Exploration One', the capsule factory can only last for 20 hours.

This means that a batch of hundreds of large high-energy batteries will be replaced almost every day.

And a large high-energy battery weighs ten kilograms.

Multiply by 100...

On the other side of the globe, Chen Jinde ran to the charging factory in Baoshan Industrial Zone every day to carry a ton of high-energy battery.

Move to the 302 where you live.

There is no elevator in the staircase room, only the third floor!

It will be repeated every day when moving up and down.

The raised hands were numb and the legs were cramped, but they had to stick to it!

Even so, on the fifth day, the battery charging speed of the charging factory has gradually failed to keep up with the power consumption rate of the capsule factory, and there has been a problem of power shortage.

Fortunately, the manufacturing workload of ten wind turbines is not large. On the sixth day, the parts parts that need to be printed and the capsule factory are all printed.

Then it is the assembly of the module, and the three components of the generator blade, the generator mainframe and the support column are assembled.

Then choose the location of the wind turbine.

Since it is a wind turbine, there is no doubt that it is necessary to choose to install it in a place with a large wind power, and the power generation effect will be better.

Only when the wind is up to standard, the power generated by the wind turbine can reach the rated 30KW.

Therefore, on the site selection issue, Chen Jin bought a wind speedometer on the other side of the earth. He was suspended by the Dajiang Elf 4Pro drone and climbed into the air 20 meters to measure the wind speed.

Finally, two more suitable locations were selected.

Location 1, located on a stone mountain ridge 30 kilometers northwest, at an altitude of more than 300 meters, not far from the battlefield, measured by the usual wind speed of up to 25m / s, the maximum instantaneous wind speed of 35m / s or more, can make wind power The machine reaches full power generation.

The disadvantage is that the distance is long and the traffic is inconvenient.

Location 2 is located on an unnamed mountain hill five kilometers to the east. The elevation of this mountain is not high and relatively flat. However, due to the prominent part of the plain landform, the average wind speed on the mountain reaches 15m/s, and the intermittent large wind speed can reach 25m / s or more.

The advantages are close distance and convenient transportation.

The disadvantage is that the power generation is low and may not reach full load.

After some trade-offs.

The location of the wind turbine installation, Chen Jinxuan is placed on the unknown mountain five kilometers away from the east.

The reason is for the safety of the generator.

In the northwest direction of Shishanling, the wind speed is usually large. Once the weather changes suddenly, the instantaneous wind power can reach 50m/s or more. This wind exceeds the structural capacity of the wind turbine, and the support column may be blown by the wind.

The device is not safe.

Recently, the Haier law planet entered into November, the weather in the northern hemisphere turned cold, and the north wind became stronger, so wind power equipment is not suitable for installation in places where the wind is large.

The nameless Tushan, five kilometers away from the east, has a slightly smaller wind, but the equipment is safer.

And the distance is very close, the earth hill is easier to excavate than the stone mountain, and it is easier to install.

The installation location is determined.

Chen Jin led the robots to set off, let the robots take advantage of the various components of the wind turbine, and swayed to the east of the nameless Tushan.

"In this position, first dig a hole in the ground three meters in diameter and five meters in depth."

“Insert some high-strength steel bars and throw some broken stones in the steel cage column.”

"Take the scraps that were removed from the Tries City Football Stadium."

"Maintenance the robot, start the laser, heat the scrap, and melt the molten steel into it. Except for the wind turbine mounting holes, fill the rest with me!"

Not bad!

On the side of the Haierfa planet, there is no ready-to-use cement.

But there is enough scrap steel.

Chen Jin let the robot get thousands of tons of scrap steel, melt it into molten iron at high temperature, and fill it into the foundation pit as the installation base of the wind wind motor.

Each pedestal melts 100 tons of molten steel, and the molten steel and gravel structure is absolutely more reliable than the reinforced concrete structure!

In addition, the cylindrical mounting hole reserved by the base is installed, and the supporting column cylinder of the wind power generator can be just fitted, and after the locking buckle is opened, the 360 ​​degree rotation can be performed, so that the wind generator is there. Facing that side, improve power generation efficiency.

With ten robots, you can complete daily maintenance.

The installation of the entire wind turbine took a total of three days.

Finally, it took a few more days to install the transformer, voltage regulator, current collector, and power storage equipment, and pulled out a ten-kilometer long transmission cable.

After some debugging.

On the fifteenth day.

Wind turbines are officially connected to the grid for power generation.

The supercomputer restarted, and Alice, who is responsible for monitoring, said:

“Master, the current power generation facilities have an average power of 260 kW and a maximum power of 280 kW. These powers are enough for a small farm.”

"Well, my camp is finally getting electricity!"

Chen Jin nodded and sighed.

The energy shortage problem in the Taikeng camp has been temporarily solved, and it has got rid of the power dependence on the other side of the earth.

But it is still too early to say that the energy issue is completely solved.

Because the big electricity users are too much!

Modified car adventure No. 1, supercomputer, capsule factory... These three things can use up 260KW of power generation.

There are also blue sky for electric vehicles, more than one hundred robots, several electric motorcycles, and some tools such as lasers. The electricity consumption of these small households is also very impressive.

Chen Jin estimates: Only wind turbines can be increased to 40 units, and the total power generation capacity can reach 1000KW or more, which can meet the electricity needs of the Taikeng camp.

However, the raw materials for printing at hand are not enough. To increase the number of wind turbines, it is necessary to wait for the collected materials to be sufficient, and then start the production.

"It's still a long time to expand the power facilities. It's awkward for half a month, so take a break and cushion it!"

"The power of 260KW is barely enough for the time being. The household wires pulled over the earth can be unplugged; the charging factory in the Baoshan Industrial Zone can also end its mission."

"Undoubtedly, getting rid of the dependence on the earth's power, the risk of secret exposure is greatly reduced, eradicating a relatively large hidden danger."

"Now, I am finally putting a part of my heart."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like