The

Not difficult to understand.

The higher.

The more people you can stuff into, the more area you can sell. You know, the land in Lowe City, in fact, is almost the same as not having money.

Around.

There are not many people, even if there are, it is almost negligible evenly spread over the whole project. In this case, of course, the higher the higher.

“Is it very high?” Mi Hao asked again.

“No.”

Shake your head across.

“Indian thought, but was rejected by the Bank of Myanmar Group. In fact, most of the buildings have been increased by less than 20%, which is still low.”

“However.”

“But there is another compromise, that is, in some places, large concessions are made, such as the addition of some large dense communities, which is very crowded.”

“This.”

“Having taken into account the requirements of both parties.”

After listening.

Mi Hao is nodded.

Also.

The projects done by the Bank of Myanmar Group have always been very demanding, and the principles are very strong. I would rather not do it or get a bunch of dislikes out.

A nice one.

One more.

Good.

Then we plan some large communities for you. Other places are still the original standard, so it will not damage the overall beauty of Loy.

And.

With the ‘high standard aesthetics’ of the Bank of Myanmar Group, even these high-rise buildings should use excellent design to make up for their deficiencies.

Well.

Good.

The rest is dry.

Following this kind of Party A, or the representative of Party A, Mi Hao can be said to be extremely comfortable, afraid that Party A will do everything pester and chirp.

I also like to change three times a day.

Which looks like now.

It’s only been more than half a month.

-Financing.

-Planning.

-Design.

-Plot.

-Tendering.

That ’s all done. Not only is it fast, but it ’s not the initiative to ask others for financing. Just sit at home and open the door, and someone will send money.

It’s almost.

How many developers are crying and fainting in the toilet, enviously wanting to hit the wall.

“Right.”

“How long can the construction start.”

“Six one.”

“Ah?”

“Six one.”

Mi Hao: “…”

Liuyi.

What’s the number today? On May 25, it is equivalent to say that there are only six days and six days to pass the review of relevant construction sections in India.

Obtain various licenses.

CEO.

Are you kidding?

In the beginning.

Even if it is a city loan from India, there is a lot of preparation time. When they entered the construction site, more than half a month had passed since the tender.

Now.

The amount of engineering has been multiplied many times, but the time is less.

At the moment.

Just listen to the opposite:

“Oh, do n’t be surprised, this time there is a lot of capital involved. When they arrive, they unite and have the ability to do many things. There is nothing surprising.”

“Also.”

Mi Hao is nodded.

Talked again, and hung up.

This time.

It is not necessary to go to Africa.

Good.

And for such a large project, there are also many bonuses. In terms of the previous project, the bonus is more than his one-year salary, and it is more than that.

This time.

The contract has nearly doubled.

Done.

As a project manager, you can get more than one million bonuses.

elated.

. . .

The next day.

Headquarters sent the drawings over.

“…”

Generally, for a house, there are at least a dozen drawings, from architectural planning to the finest bill of materials, a block of drawings, directly on tons.

And now.

Sixteen blocks.

Okay.

The archive room is almost full. It looked dizzy and Mi Hao twitched at the corner of his mouth. He was really a bit skeptical. Can this be done?

How long.

This is still 16 blocks. How big is the whole Loy City, needless to say, it is very big. Just a drawing, it needs a dozen vans to pull it.

This design task is more difficult than Hell Level under limited time. However, it doesn’t matter who designed it and how it was designed.

The important thing is-built.

“hu!”

Took a deep breath and took a master plan.

Meeting.

“We can see that this project is distributed in the four directions of east, south, west and north, and some are connected, so there are a total of six contiguous areas.”

“Each area, one project department.”

“This time.”

“Due to the huge amount of construction, the company will send three more deputy managers to come over. According to the plan, the construction will start on June 1st, and the related packages, the past few days will arrive.”

“…”

He is bull again.

Not so many areas.

Therefore.

Two more men were added to him. After all, every block was made up of hundreds of buildings, like the hills of drawings, running too far back and forth.

“the past few days.”

“Everyone is familiar with the drawings and formulating the construction plan. Once the construction starts, the progress is not with the others. Although this time the amount of construction is large, I believe you have an Experience.”

“In short.”

“Proper planning of processes, procedures, must.”

“Equipment, personnel, and the head office will assist in the allocation. This time the project is large, and the demand for materials is also large. Langyu County allocated a piece of land to the south.”

“Specially used for material transfer for this project.”

“…”

After two hours.

At the end of the meeting, Mi Hao could n’t do anything. There were too many things. It ’s the way to do engineering, whether it ’s in the early stage, Middle-Stage, late stage, a lot of things.

Fortunately.

Exhausted, not afraid of arrears.

Otherwise,

After a year of hard work and no money, I was troubled.

. . .

After the meeting.

Get on.

Come to the India-Myanmar border.

At the moment.

It was almost the same as when he first came. I saw a large number of construction vehicles waiting in line. Those who had finished their work before came back and had to go there. It is busy now.

Liuyi is the construction time.

What do you mean?

It means that you can build a house, and before building a house, there is another task, that is, three links and one leveling, water, electricity, and access road.

And the leveling of the venue.

Otherwise.

He would n’t be surprised to start construction on June 1st. After getting the land, the three links and one leveling will be able to adjust themselves, but building a house requires various certificates.

Image review.

Capital audit.

Pictures of dozens of trucks, even if the construction and other sections of the Indian state are all together, Mi Hao estimates that one month is enough, but now it only takes a few days.

Seeing there, the first reaction is estimated: Can I give up?

After the card.

Some places are dusty. It is leveling the land. The land here is relatively flat, but it is much simpler. As for the three links.

It ’s also simple.

Digging.

Buried pipes.

in one go.

If you use water, you can use the city of Loy, and the electricity is also available. There are two mature power plants, one main and one backup. Now at worst, the two are turned on together.

Fully satisfied.

And.

The water and electricity pipelines are not running around the entire area, but are surrounded by a circle to supply the main construction needs of electricity and water.

For example, concrete mixing.


Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like